Basildon Hospital, Sunday 22 November, 10am to 7pm:
Highways UK will be attending Basildon Hospital’s site to resurface the road leading to the Essex Cardiothoracic Centre (CTC).
The work will start on the corner of Fobbing farm.
Access to the front CTC can be provided by the back gate in Dry street. Access to Mental health Services will be via the road outside outpatients.
Click here to download a map showing the location of the works >>